Skip to collection list Skip to video grid

Videos

Replacing the Sample Loop
Demonstrates how to replace the sample loop in the ACQUITY UPLC Sample Manager. After replacing the inject valve and sample loop it will be necessary to prime the wash syringe.
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
  • Chapters
  • descriptions off, selected
  • subtitles off, selected
    Skip to collection list Skip to video grid

    Sample Manager (UPLC)

    Replacing the Sample Loop

    Demonstrates how to replace the sample loop in the ACQUITY UPLC Sample Manager. After replacing the inject valve and sample loop it will be necessary to prime the wash syringe.